Year: 2024
Project in progress
Client: Perutnina Ptuj
Location: Kosovo
Size: 10.051 m2
PERUTNINA KOSOVO
The future location of the chicken slaughterhouse facility is at Kosovo.
In terms of significance, this is a facility of regional importance, which will
contribute to the development of the industry and employment of workers from this area.
The main building is designed as a single volume, with a diverged southwest facade in
line with functional and technological requirements. The building is adjusted to the
expression of industrial structures, quite enclosed, with minimal openings/windows
and with thermal-insulation panels that conceal the basic structural system of reinforced
concrete pillars and beams. The only exceptions are: the office section, which stands
out on the facade as a cube, with glass partitions divided by vertical elements at regular
intervals, the main entrance to the building, which is also transparent and open, and part
of the floor corridor, which gains natural light through the opening of the facade.
Auxiliary facilities are simple in design, single-story.